LAML Current Case Studies
RAF Valley AGL Refurbishment
RAF Valley AGL Refurbishment
As part of the AOS Framework, LAML delivered the AGL refurbishment for RAF Valley’s secondary runway, supporting Lagan Aviation & Infrastructure.
Bristol Airport AGL-Workstream 2
Bristol Airport AGL - Workstream 2
This project incorporated the provision of Aeronautical Ground Lighting system (AGL) equipment and cables for the AGL resilience upgrade works at Bristol Airport.
Glasgow Prestwick Airport Project MACE
Glasgow Prestwick Airport - Project MACE
This project forms the initial part of GPA’s long-term redevelopment plan and is one of the largest investments undertaken by the Airport stakeholders.
Manchester Airport MAN-TP Infrastructure Works
Manchester Airport MAN-TP Infrastructure Works
LAML delivered a major electrical and civils airfield upgrade for the MAN-TP Capital Project at Manchester Airport, involving groundworks to upgrade a taxiway duelling system, a new Link 360 ILCMS systemMEP works, drainage, ducting and removal of legacy assets.
Edinburgh Airport AGL & Civils Project
Edinburgh Airport AGL & Civils Project
LAML was appointed to undertake both AGL and AGL Civils work on the Edinburgh Airport Runway rehabilitation project for Lagan Aviation.
Bristol Airport Civils Maintenance Framework
LAML supported Bristol Airport with the following activities:
Maintenance works during the March & November closures – usually operating with 5 working groups on a shift with up to 65 men and 45 vehicles…