Bristol Airport Civils Maintenance Framework
LAML supported Bristol Airport carry out planned maintenance.
Client: Bristol Airport
Contract Dates: June 2024 - Ongoing
LAML supported Bristol Airport with the following activities:
Maintenance works during the March & November closures – usually operating with 5 working groups on a shift with up to 65 men and 45 vehicles
Carrying out asphalt & SMA patch repairs
Inlaid crack repairs
Saw cutting & sealing
Crack chasing
AGL replacement
Veneer surfacing
Overbanding
Paint marking reinstatement
Planned maintenance activities on the Aprons have included:
Ironwork replacement
Structural repairs to drainage chambers
Installation of drainage systems: Slot drains, carrier pipes and new chambers
Trenching for new services
Surfacing of Apron roads
High Performance Joint Installations
Concrete repairs
LAML are retained for 24-hour emergency call-outs on the runway and taxiways, undertaking patching and surface repairs.